| |
Qualitative end product
The choice of materials is based on quality
Electricity
Approved electrical installation excl. instruments, included
Automatic fuses and earth leakage circuit breaker
Luminous spots, switches and wall sockets (BTicino)
Sanitation
Water piping/supply warm and cold water and drainage from the kitchen and bathroom/ supply
cold water and drainage for washing machine, basin, 2 wc's and service tap/supply cold water
to heating boiler
Ventilating, damp spaces vapor cover
Acrylic resin bath, single sink in the S70 cabinet, 2 duobloc-wc's, basin and service tap, incl. installation
Heating
Gas: condensation boiler, radiators with enclosures and wall junctions, pipes and junctions
Central heating (at extra cost): fully equipped boiler (160 l), burner, radiators
with enclosures and wall junction, pipes, double-walled boiler tank (2.900 l)
situated underground and Poujoulat-chimney
Floor covering
Covering: sand and cement (ca 7 cm)
Gamma floor covering: vitrified ceramic in living room, hall, kitchen, bathroom, toilet and
washing place/ceramic tiles in the garage and storage room/full carpeting or vinyl in the office, bedrooms and night hall
Plinths: ceramic on floor areas and wood on fully carpeted- or vinyl areas
Marble works
For the windows sill, you can choose from one gamma proposed by the contractor (18 cm deep and 2 cm thick)
Inner doors
Flat inner doors are fitted with locks, standard door handles in white PVC or insulated aluminum and 3 hinges
The frames provide a white layer of earth
Attic finishing (if applicable)
Meranti steps, a top front window or roof plan window per room, inner walls of concrete,
inner doors, coating and floor covering, plasterboards, electricity and heating
Storey (if applicable)
Cabinet work outside, meranti steps, inner doors, floor covering, electricity and heating
|
|
|